Concrete consolidating counter self top

posted by | Leave a comment

These are used in the application of bridges, heavy loaded structures, and roof with longer spans.Also Read: Prestressed Concrete Principles, Need and Advantages Various structural elements can be made and cast in the factory as per the specifications and bought to the site at the time of assembly.

Most of the mega concrete projects are carried out through prestressed concrete units.Once the concrete sets and harden, the structural unit will be put in compression.This phenomenon of prestressing will make the lower section of the concrete member to be stronger against the tension.The normal strength concrete has an initial setting time of 30 to 90 minutes that is dependent on the cement properties and the weather conditions of the construction site.The plain concrete will have no reinforcement in it.

Leave a Reply

Free chat fuck no sighn up